Published: June 20, 2020

AsBuilt Deaerator Fab Inspection

The Challenge:

AsBuilt was contracted to confirm the fabrication of an 80 foot long by 12-foot diameter deaerator assembly that was fabricated off site.  Key process connections point locations were critical for a smooth installation during a very tight plant outage.   

The Solution:

AsBuilt captured the existing piping system and developed a point cloud.  The point cloud data was converted to 3D solid modeling for design backgrounds.

Deliverables:

  • Point Cloud 
  • Navisworks Model 
  • 3D Modeling