Published: May 5, 2022

AsBuilt for Valve Replacement

The Challenge:

AsBuilt was contracted to capture the as-is conditions of a piping system in a hydro power plant.  The plant operation required a new valve placement in an existing piping system.  The plant lacked up to date and correct drawings for the project execution. 

The Solution:

AsBuilt captured the existing piping system and developed a point cloud.  The point cloud data was converted to 3D solid modeling for design backgrounds.   

Deliverables:

  • Point Cloud 
  • Navisworks Model 
  • 3D Modeling