Published: March 5, 2020

AsBuilt of a Hydro Dam Intake

The Challenge:

The hydro dam management requested the scanning and modeling of the intake system.  The facility did not have as built drawings of the equipment to be upgraded. 

 

The Solution:

AsBuilt was contracted to collect the as-is conditions of the dam intake arrangement.  The data was collected in an 8-hour window and converted to 3D model space within 2 weeks.  If traditional “measuring up” was used, the results would be inaccurate. 

 

Deliverables:

  • Point Cloud 
  • 3D Modeling