Published: March 6, 2020

AsBuilt of Wastewater Piping

The Challenge:

AsBuilt was contracted to capture wastewater treatment piping and equipment at a power plant using 3D scanningThe client wanted to document the existing wastewater system layout and convert the facility into 3D model space and develop ISOs.   The 3D model was used for the integration of new equipment, workspace management, and employee training. 

 

The Solution:

AsBuilt spent approximately 6 hours onsite to capture the project areas. The data was processed, converted to a 3D model, drawings and shared with the client. 

 

Deliverables:

  • Point Cloud 
  • Revit Model 
  • 3D Modeling