October 4, 2024
The Challenge
AsBuilt was engaged to support the replacement of a Blowdown Sump Pump Discharge System’s piping. The project required precise as-built data to facilitate design engineering, ensure proper fitment, and document all modifications for compliance with Management of Change (MOC) requirements.
The Solution
AsBuilt conducted a high-precision laser scan of the area, providing an accurate as-built reference for design and engineering. The scan data was utilized at the project's outset to develop an IFC piping spool installation package, complete with a bill of materials (BOM). Following installation and post-outage work, AsBuilt performed a final scan to capture as-built conditions and document all MOC information, ensuring a seamless and well-documented upgrade.