AsBuilt of a Transformer Replacement
October 15, 2024
October 2, 2024
The Challenge
AsBuilt's partner Acensium, was contracted to provide scanning, modeling, design, and engineering services for an SJAE WB Vacuum Priming System at a power plant. The project required precise data to ensure the system’s design and integration were flawless.
The Solution
AsBuilt conducted a detailed laser scan of the area of interest, capturing all structural, equipment, and utility details. This data was then used to create accurate 3D models and design the vacuum priming system for seamless integration into the plant.
Deliverables
Ready to create your Digital Twin?