October 11, 2024
The Challenge
A power plant needed to replace its aging bunker discharge chutes, which were prone to pluggage during coal discharge. The goal was to remove the old chutes and install newly designed systems that would improve efficiency and eliminate operational issues.
The Solution
AsBuilt conducted a comprehensive laser scan of the area, capturing all structural, equipment, and utility details with precision. After post-processing and quality verification, the scan data was used to develop an accurate 3D model. Our partner, Acensium was responsible for designing and fabricating the new chutes, ensuring seamless integration with the existing bunker discharge system. This included essential hardware such as gaskets, linear impactor mounts, lifting lugs, and shims to support a smooth installation and long-term performance.
Deliverables