The Challenge:
AsBuilt was contracted for the design engineering, fabrication support, and installation support of crusher house transfer chutes. The plant needed to install new transfer chutes both above and below the crusher, along with a new magnetic separator and bypass chutes. The goal was to ensure reliable operation, reduce spillage, dusting, and pluggage in the crusher house transfer chutes.
The Solution:
After a site visit, laser scanning data was collected to create accurate electronic background drawings for modeling. Acensium's designers then created a wire mesh surface and performed discrete element modeling (DEM) analysis. Once the general arrangement drawings were approved, detailed fabrication drawing packages and associated 3D files were created and delivered to the client.
Deliverables: