AsBuilt of a Wash Down System

Published:

June 8, 2014

AsBuilt of a Wash Down System

The Challenge

AsBuilt was contracted for the design and engineering of a coal handling wash down system. Water pressure and flow requirements were to be communicated at each discharge point within the systems.

The Solution

Laser scanning was performed for pipe routing and for the locating of spray nozzles throughout the structure of the system

Deliverables

  • Raw Scan Data
  • Point Cloud

Ready to create your Digital Twin?

Ready to create your Digital Twin?

Get Started