AsBuilt of Bunker Discharge Gates and Chutes

Published:

October 3, 2024

AsBuilt of Bunker Discharge Gates and Chutes

The Challenge

AsBuilt's partner, Acensium was contracted for design engineering, fabrication, and installation support for multiple bunker discharge chutes. The plant aimed to install new discharge chutes to eliminate features that caused pluggage during coal discharge to the feeders. This required designing and procuring the fabrication of new chute work and necessary hardware to connect the chutes to the existing bunker discharge.

The Solution

AsBuilt conducted a detailed laser scan of the discharge area, capturing all structural, equipment, and utility details. Using this data, we developed a comprehensive fabrication and installation package to ensure the new chutes were accurately designed, fabricated, and seamlessly integrated with the existing system.

Deliverables

  • Fabrication and Installation support
  • Design Engineering