October 19, 2022
The Challenge
A power plant was planning on upgrading piping along the HRSGs.
The Solution
The piping at three separate units was scanned from the top of the HRSGs all the way down each level of the units, to the pipe rack containing the HRH line that all three tie into.
Deliverables
Ready to create your Digital Twin?
Get Started